This is used for secondary soil reinforcement, creating a stronger composite structure, which increases the performance of the under-laying sub-grade. Such as, weak sub-grade, heavy loads thick fill layers, high aggregate cost, contaminated sub-grades or shallow utilities, which will disrupt construction schedule and budget. Used but not limited for highway, secondary road, parking areas, airport runways, truck and freight distribution centers and terminals with heavily loaded equipment yards.
Primary soil reinforcement allows savings of 30% - 60% over concrete retaining walls, enhancing property values with naturally vegetated facing option, installs quickly and without specialized fill material, adapts to even extreme conditions and create usable land in previously undeveloped areas creating slopes up to 70°. Application includes but not limited to commercial, industrial, retail, residential, transportation infrastructure, recreation facilities and municipal waste management.
Erosion control for slopes from 3:1 – 1:1 or greater for moderate to high flow channels with longevity from 2 months to 36 months suitable for highway, roadside ditches, mines, pipeline, woodlands, golf courses, residential lawns, landfill caps, severe slopes and shoreline protection |